Monday, March 22, 2010

DAY 31 - Texturizing the Master Suite Walls

Happy Monday, readers,


It's sunny, it's 70, and to kick of Week 7 of Remodeling 1070, it's all about TEXTURE.


Day 31 started with a quick visit from the sheet rock team to do some touch up and sanding before the next team arrived to spray the textured coat on the walls and ceilings. You can see some photos of the texture - and the requisite pile of debris - below.


Matt also stopped by this morning to lay out the next steps. The tile guy will be next up to bat to grade the shower floor and start setting the tile for the shower floor, walls and shower bench. He also does the glass block, so that will get done in conjunction with the shower, which should be very soon.


Matt also took our paint chips with him so he can get samples of the three colors we are considering for the master suite. He wants to paint some swatches on the actual walls to give us an idea of what the various shades will look like so we can make our final choice.


We are inching ever closer to moving back into the master suite!!