Hello readers,
I hope everyone is having a terrific weekend. As we roll into Sunday, we are gearing up for another busy week here at Remodeling 1070. It's difficult to believe that this past week ended the first full month of renovation work, and what a full week it was.
We ended Day 20 on Friday with sunrise to sundown activity with electricians, framers and a clean up crew on hand. At this point, the master suite has been reframed to accommodate our design updates and our decision to go with pocket doors on the bathroom and closet. All the debris is gone, all the flooring and carpeting is gone and the entire master suite is now wired. The electrician needs to return Monday for about an hour to finish up one connection, and then we move on to the next level: Installation. We should finally start to see the mechanicals and drywall going up next week in addition to the new bedroom door being cut into the wall and the old bedroom entrance being sealed off.
Here are some updated photos for your viewing pleasure. I should have a lot more photos throughout next week as the installation gets under way. Enjoy the rest of your weekend!
The reframed doorway of the second master closet, shifted to the right so the pocket door can slide into the left side of the wall.
The removal of the carpet was a big moment. One of the changes that is most exciting about Remodeling 1070 is the replacement of all carpeting with wood floors.